| Which of the following is not generally found in JIT environments? |
A. Push systems
B. Low amounts of waste in the form of time and production waste
C. Very small amount of variability
D. Low inventory stockpiles
|
In the just-in-time framework, waste is |
A. steps that add value.
B. Necessary to the elimination of variability.
C. the natural by-product of a push system. D. anything that does not add value.
Categories:
