QUESTION 1
The process of prioritizing jobs that have been assigned to a resource is called
|
loading |
||
|
monitoring |
||
|
sequencing |
||
|
input/output analysis |
||
QUESTION 2
If the work remaining on a job is greater than the time remaining before the job is due, then the critical ratio will be greater than one (1).
True
False
QUESTION 3
The shortest processing time (SPT) rule is most useful when the job shop is highly congested.
True
False
QUESTION 4
The process of prioritizing jobs that have been assigned to a resource is called sequencing.
True
False
QUESTION 5
Which of the following is not an identified objective in scheduling?
|
Meet consumer due dates |
||
|
Minimize response time |
||
|
Maximize work in process inventory |
||
|
Minimize time in the system |
||
QUESTION 6
Which of the following is not an objective of scheduling
|
minimizing job lateness |
||
|
maximizing time in the system |
||
|
minimizing overtime |
||
|
maximizing machine utilization |
||
QUESTION 7
Scheduling is the second stage of planning after forecasting.
True
False
QUESTION 8
The shortest processing time (SPT) rule tends to maximize the average number of jobs in the system.
True
False
QUESTION 9
The process of assigning work to limited resources is known as
|
loading |
||
|
sequencing |
||
|
monitoring |
||
|
dispatching |
||
QUESTION 10
If a job is ahead of schedule, then its critical ratio (CR) will be
|
less than 1.0 |
|
|
greater than 1.0 |
|
|
equal to 1.0 |
|
|
equal to 0.0 |