QUESTION 1

The process of prioritizing jobs that have been assigned to a resource is called

loading

monitoring

sequencing

input/output analysis

QUESTION 2

If the work remaining on a job is greater than the time remaining before the job is due, then the critical ratio will be greater than one (1).

True

False

QUESTION 3

The shortest processing time (SPT) rule is most useful when the job shop is highly congested.

True

False

QUESTION 4

The process of prioritizing jobs that have been assigned to a resource is called sequencing.

True

False

QUESTION 5

Which of the following is not an identified objective in scheduling?

Meet consumer due dates

Minimize response time

Maximize work in process inventory

Minimize time in the system

QUESTION 6

Which of the following is not an objective of scheduling

minimizing job lateness

maximizing time in the system

minimizing overtime

maximizing machine utilization

QUESTION 7

Scheduling is the second stage of planning after forecasting.

True

False

QUESTION 8

The shortest processing time (SPT) rule tends to maximize the average number of jobs in the system.

True

False

QUESTION 9

The process of assigning work to limited resources is known as

loading

sequencing

monitoring

dispatching

QUESTION 10

If a job is ahead of schedule, then its critical ratio (CR) will be

less than 1.0

greater than 1.0

equal to 1.0

equal to 0.0