0 Comments

20 questions. mutiple hoice/true false

Question 1 (1 point)

Process capability calculations make little sense if the process:

Question 1 options:

-data were taken over a period of time

-is not in statistical control

-variations are due to special causes

-has control but is not capable

Save

Question 2 (1 point)

In a variable sample size situation–such as when the number of units produced varies–if the sample size in a p-chart increases from 100 to 120, the upper and lower control limits will:

Question 2 options:

-move farther apart

-move closer together

-remain the same distance apart

-both shift upward

Save

Question 3 (1 point)

Twenty samples of size 6 were collected for a variable measurement. Determine the upper control limit (UCL) and lower control limit (LCL) for an R-chart if the sum of the sample ranges equals 88.0.

Question 3 options:

UCL = 8.8176, LCL = 0.0000

UCL = 9.3016, LCL = 0.3344

UCL = 13.2000, LCL = 0.0000

UCL = 29.3921, LCL = 0.0000

Save

Question 4 (1 point)

A(n) _____ is a performance characteristic that is either present or absent in the product or service under consideration.

Question 4 options:

-variable

-control limit

-attribute

-performance range

Save

Question 5 (1 point)

Control limits relate to _____, while specification limits relate to individual measurements.

Question 5 options:

-values within the upper and lower control limits

-total values in the range

-median values

-averages of samples

Save

Question 6 (1 point)

An alternative to using the R-chart is the:

Question 6 options:

np-chart

s-chart

c-chart

p-chart

Save

Question 7 (1 point)

The sample size for an x-chart:

Question 7 options:

-should be greater than or equal to 30

-is larger than that for an Xbar-chart

-is equal to one

-depends on the number of measurements taken

Save

Question 8 (1 point)

Which of the following is NOT an indication of an out-of-control process?

Question 8 options:

-Five consecutive points fall on one side of the center line

-Four of five consecutive points fall within the outer two-thirds region between the center line and one of the control limits

-Two of three consecutive points fall in the outer one-third region between the center line and one of the control limits

-A single point falls above the upper control limit

Save

Question 9 (1 point)

A precision parts manufacturer produces bolts for use in military aircraft. The specifications for bolt length are 37.50 ± 0.25 cm. The company has established an Xbar-chart and an R-chart using samples of size five. The centerlines for the Xbar-chart and R-chart are set at 37.65 cm and 1.03 cm, respectively. What is the value of Cpk for this process?

Question 9 options:

0.08

0.28

0.75

0.03

Save

Question 10 (1 point)

Short repeated patterns in a control chart, with alternating high peaks and low valleys, are known as:

Question 10 options:

-trends

-cycles

-spikes

-reciprocals

Save

Question 11 (1 point)

Which of the following pairs of charts are used together?

Question 11 options:

Xbar-chart and p-chart

R-chart and p-chart

R-chart and s-chart

Xbar-chart and R-chart

Save

Question 12 (1 point)

In pre-control, which zone covers the nominal dimension?

Question 12 options:

-Gray zone

-Yellow zone

-Red zone

-Green zone

Save

Question 13 (1 point)

Statistical process control relies on _____.

Question 13 options:

-capability models

-variance analyses

-control charts

-conformance reports

Save

Question 14 (1 point)

Which of the following charts is used to monitor the total number of defects per unit when a constant subgroup size is employed?

Question 14 options:

s-chart

c-chart

p-chart

u-chart

Save

Question 15 (1 point)

Collecting _____ data is usually easier than collecting _____ data because the assessment can usually be done more quickly by a simple inspection or count.

Question 15 options:

-attribute; variable

-concrete; continuous

-random; discrete

-simple; continuous

Save

——————————————————————————–

Question 16 (1 point)

When using a control chart — one rule of thumb is to have a minimum of 25 data points–preferable 40 or more.

Question 16 options:

True

False

Save

Question 17 (1 point)

When the R-chart is not in control (has a signal), you should not investigate signals found in the related Xbar chart.

Question 17 options:

True

False

Save

Question 18 (1 point)

Before control charts can be used to identify the presence of special causes on line, the process must be brought into a state of statistical control; that is, the data used to establish the charts and define the control limits must be subject only to a constant system of common causes.

Question 18 options:

True

False

Save

Question 19 (1 point)

A scatter diagram can help identify possible relationship patterns and the dispersion around those patterns

Question 19 options:

True

False

Save

Question 20 (1 point)

A flow chart can help document the product stream (rational ample) associated with the data plotted in a control chart.

Question 20 options:

True

False

Save