Question 1 6
/ 6 points
Match the services with its statement
AAA, NAC
Unified message
Storage of critical data
Secure communications
Improved computational resources
Access from a remote location
1.
Identity
2.
Mobility
3.
Storage
4.
Compute
5.
Security
6.
Voice/collaboration
Question 2 4
/ 4 points
Match the devices with their functionality
Host has multiple gateways
Data Storage
LAN and WAN network
Load balancing
1.
Workstation-router redundancyServer
2.
Route redundancy
3.
Media redundancy
4.
Server redundancy
Question 3 1
/ 1 point
X is an online university which recently added a new
Application server to enhance the virtual class room environment. The
university added a fifth ISP to connect this application server to the
Internet. In which sub module of the Cisco Enterprise Module, would you place
the server?
A)
E-Commerce
B)
Enterprise Edge
C)
Internet Connectivity
D)
Edge Distribution
E)
Enterprise Campus
Question 4 0.78
/ 1 point
You are preparing a design document for X network. From
the list below which components would you include in the design documents?
(Select 5)
A)
OSI Model
B)
Appendixes
C)
List of contact person
D)
Routing protocols
E)
IP addressing scheme
F)
List of layer 2 and layer 1 devices
G)
Introduction
H)
Implementation plan
I)
Applicable Government regulation
Question 5 1
/ 1 point
During the planning stage of a network upgrade, the customer
wants a 30% improvement on the the users
get from the database. During which
stage of characterizing the customer’s network would you address this
requirement?
A)
Design Phase
B)
Implementation phase
C)
Performance Requirement
D)
Operational Phase
Question 6 1
/ 1 point
During your characterization of the network, you realize
that WAN implementations and LAN networks are managed by different groups. During which data collection stage would you
note this information?
A)
Technical Requirement
B)
Ignore
C)
Design Requirement
D)
Office Politics
Question 7 1
/ 1 point
From the list below select all the advantages of
hierarchical design? (Select the best )
A)
Ease of manageability
B)
Fault tolerance
C)
Scalability
D)
Predictability
E)
All of the above
Question 8 0.33
/ 1 point
You need to add a new site to your hierarchical network.
Which of the following are possible places in which to connect a new site to
your existing network? (Select 2)
Access layer
Distribution layer
Core layer
Question 9 1
/ 1 point
The customer wants you to determine the maximum number of
multimedia workstations that should populate a segment. What information do you
need from the customer in order to proceed with this request?
A)
LAN Protocol
B)
Fiber or Cat5 cable
C)
Number of users
D)
Bandwidth on the segment
E)
Application running on the segment
Question 10 1
/ 1 point
Which layers of the OSI model does RMON2 operate on?
A)
Physical to Network
B)
Network to Application
C)
Physical to Application
D)
Physical to Data link
Question 11 1
/ 1 point
You have been assigned to collect and characterizing an
existing network.Which of the following stages would you first consider when
characterizing an existing network? (Select the best .)
A)
traffic analysis
B)
network audit
C)
network assessment
D)
organizational input
Question 12 1
/ 1 point
Which of the following data center designs provides the best
combination of availability, scalability, redundancy, and WAN
affordability? (Select the best .)
A)
multisite data centers spread across a large geographical
area
B)
single-site data center with clustered servers
C)
multisite data centers located in close proximity
D)
single-site data center
Question 13 1
/ 1 point
List one limitation of a bottom-up approach to network
design?
A)
It is more time-consuming than the top-down approach.
B)
It does not focus on devices and technologies.
C)
It focuses on applications and services.
D)
It can lead to costly redesigns.
E)
It requires a detailed analysis of an organization’s
requirements.
Question 14 1
/ 1 point
You want to select a technology which will provide
authentication, encryption, and message integrity. From the list below, which
one you would select?
A)
RMON
B)
SNMPv1
C)
RMON2
D)
SNMPv3
E)
SNMPv2
Question 15 1
/ 1 point
You are gathering the network requirements to upgrade an
existing network.
In which of the following categories of the proposal would
you consider the budgeted costs? (Select the best .)
A)
technical constraints
B)
organizational constraints
C)
technical goals
D)
organizational goals
Question 16 1
/ 1 point
From the list of sub-modules, below, select the sub-module
of the SP edge module.
A)
campus core layer, building distribution layer, and building
access layer
B)
enterprise data center, enterprise branch, and teleworkers
C)
enterprise WAN, Internet connectivity, e-commerce servers,
and remote access via VPN
D)
PSTN services, site-to-site WAN access, and ISP connectivity
Question 17 1
/ 1 point
Which of the following statements best describes
NetFlow? (Select the best .)
A)
NetFlow is a protocol that extends the standard MIB data
structure and enables a managed device to store statistical data locally.
B)
NetFlow is a security appliance that serves as the focal
point for security events on a network.
C)
NetFlow is used to monitor and manage network devices by
collecting data about those devices.
D)
NetFlow is a Cisco IOS feature that causes minimal impact on
the CPU utilization on each network device during an audit. (Select the best )
Question 18 0.43
/ 1 point
You have been asked to upgrade E-commerce Module for high
availability and high security. From the list below select the devices which
you will add in your E-Commerce Module. (Select 4)
A)
Web and application servers
B)
Data base servers
C)
Internet edge routers
D)
FTP and HTTP servers
E)
Network intrusion prevention systems (IPS)
F)
DNS servers
G)
Multilayer switch with IPS modules
Question 19 1
/ 1 point
X is currently upgrading its network to use a new
enhanced learning application and provide high security. The state funding for
this project will expire in four months. Most of the current network equipment
cannot use virtualization technology which is critical for the security of the
new application. In addition, the current technical staff needs to be trained
using the same funding.
What is the technical constraint faced by X? (Select the
best )
A)
The cost associated with the new virtualization
B)
To enhance the security of the network
C)
The fact that the contract expires four months
D)
The cost associated to train the current staff
E)
The characterizing existing equipment for compatibility with
new application
Question 20 1
/ 1 point
From the list below select the best multicast range in a
segment, a network can sustain.
A)
15% to 35%
B)
0% to 40%
C)
20% to 30%
D)
10% to 40%
Question 21 0.2
/ 1 point
You are reviewing a high level network diagram to locate the
DNS server. In which modules would you expect to find the company’s DNS server?
(Select 2)
A)
building core
B)
building access
C)
enterprise edge
D)
building distribution
E)
data center
Question 22 1
/ 1 point
Refer to the exhibit below.
ppdioo
During which stage of PPDIOO process, do you prepare
configurations details?
Prepare
Plan
Design
Implementation
Optimize
Operate