0 Comments

Part 1 of 1 – 95.0/
100.0 Points

Question 1 of 20 5.0/ 5.0 Points

When there is no well-understood or agreed-on procedure for
making a decision, it is said to be:

A. undocumented.

B. unstructured.

C. documented.

D. semistructured.

Question 2 of 20 5.0/ 5.0 Points

The type of decision that can made by following a definite
procedure is called a(n) __________ decision.

A. structured

B. unstructured

C. semistructured

D. procedural

Question 3 of 20 5.0/ 5.0 Points

The decisions involved in creating and producing a corporate
intranet can be classified as __________ decisions.

A. Procedural

B. Unstructured

C. Structured

D. Semistructured

Question 4 of 20 5.0/ 5.0 Points

The decision to approve a capital budget is an example of
a(n) __________ decision.

A. semistructured

B. unstructured

C. structured

D. undocumented

Question 5 of 20 5.0/ 5.0 Points

The five classical functions of managers are planning,
organizing, deciding, controlling, and:

A. coordinating.

B. leading.

C. managing.

D. negotiating.

Question 6 of 20 5.0/ 5.0 Points

In contrast to the classical model of management, behavioral
models see the actual behavior of managers as being more:

A. systematic.

B. informal.

C. reflective.

D. well organized.

Question 7 of 20 5.0/ 5.0 Points

Behavioral models of managers find that, from observation,
managers:

A. perform often fewer than 100 activities a
day.

B. operate best with standardized, predictable,
printed information.

C. create a formalized, hierarchic structure of
contacts to provide filtered information.

D. typically work in a fragmented manner, with
only 10% of activities exceeding an hour in duration.

Question 8 of 20 5.0/ 5.0 Points

The concern that the structure of data is consistent within
an information source reflects which quality dimension of information?

A. Accuracy

B. Integrity

C. Validity

D. Consistency

Question 9 of 20 5.0/ 5.0 Points

MIS typically produce:

A. new ways of looking at data that emphasize
change, flexibility, and rapid response.

B. fixed, regularly scheduled reports based on
data extracted from the organization’s TPS.

C. solutions to semistructured problems
appropriate for middle management decision making.

D. assumptions, responses to ad hoc queries, and
graphic representations of existing data.

Question 10 of 20 5.0/ 5.0 Points

The components of a DSS are the:

A. internal corporate database, external data
sources, and analysis tools.

B. data visualization tools, software, and
graphics capabilities.

C. database, graphics capabilities, and analysis
tools.

D. database, software system, and user
interface.

Question 11 of 20 5.0/ 5.0 Points

The four kinds of structural organizational change enabled
by IT, in order from least to most risky, are:

A. rationalization, automation, reengineering,
and redesigning.

B. rationalization, automation, reengineering,
and paradigm shift.

C. automation, rationalization, reengineering,
and paradigm shift.

D. automation, redesigning, restructuring, and
paradigm shift.

Question 12 of 20 5.0/ 5.0 Points

In automation:

A. business processes are simplified.

B. business processes are reorganized to cut
waste and eliminate repetitive, paper-intensive tasks.

C. standard operating procedures are streamlined
to remove bottlenecks.

D. employees are enabled to perform their tasks
more efficiently.

Question 13 of 20 5.0/ 5.0 Points

Business processes are analyzed, simplified, and redesigned
in:

A. BPR.

B. rationalization of procedures.

C. automation.

D. a paradigm shift.

Question 14 of 20 5.0/ 5.0 Points

The process of streamlining business procedures so that
documents can be moved easily and efficiently is called:

A. business process reengineering.

B. automation.

C. work flow management.

D. rationalization.

Question 15 of 20 5.0/ 5.0 Points

Based on your reading of the chapter, the redesign of
mortgage application process by major mortgage banks was an example of which
type of organizational change?

A. Automation

B. Paradigm shift

C. Business process reengineering

D. Restructuring

Question 16 of 20 5.0/ 5.0 Points

Which process develops a detailed description of the
functions that a new information system must perform?

A. Feasibility study

B. Requirements analysis

C. Systems design

D. Test plan development

Question 17 of 20 0.0/ 5.0 Points

The entire system-building effort is driven by:

A. organizational change.

B. feasibility studies.

C. the information value chain.

D. user information requirements.

Question 18 of 20 5.0/ 5.0 Points

Systems design:

A. describes what a system should do to meet
information requirements.

B. shows how the new system will fulfill the
information requirements.

C. identifies which users need what information,
where, when and how.

D. is concerned with the logical view of the
system solution.

Question 19 of 20 5.0/ 5.0 Points

In a parallel conversion strategy, the new system:

A. is tested by an outsourced company.

B. replaces the old one at an appointed time.

C. and the old are run together.

D. is introduced in stages.

Question 20 of 20 5.0/ 5.0 Points

Changes in hardware, software, documentation, or production
to a production system to correct errors, meet new requirements, or improve
processing efficiencies are termed:

A. compliance.

B. production.

C. maintenance.

D. acceptance.

Order Solution Now

Categories: