Your analysis should include the following:
1.An analysis of the benefits and challenges associated with resource scheduling
2.A discussion of at least two methods used to schedule resources and examples of when each method would be most appropriate, given the scope of the project
Choose which method would be most appropriate for the project selected and explain why you felt it was most appropriate.
You must include at least two additional sources, one of which must be a journal article, to support your analysis.
Prepare this assignment according to the APA guidelines
Project Scope
Project Objective
To improve future sales through relocation of one of the stores of Retail Inc. to a larger facility in a greater population sector and
modernize older locations.
Deliverables Finding a location of 5000 sq. feet for one of the stores Relocate one of the stores to a new facility with larger capacity and population. Further double its size from 2500 sq. feet to 5000 sq. feet. Modernization of the other two stores.
Milestones
Sl
No. 1
2
3
4
5 Activity Schedule
Relocation activity initiation
Location finalization and foundation
Construction start
Interim inspection of large relocated store
and upgrade initiation of other two stores
Final inspection Time Line
Feb 14th
March 15th
March 16th
Sep 20th, 2015
November 20th, 2015 Requirements The new location of the 3rd store should have ample amount of space and customer base. Up gradation process should take into account the latest features available in any retail store or mega store. Store must meet local building codes which is in compliance with regulations. Hiring skilled personnel for up gradation Local contractors hiring for relocation of the store Hiring flagstaff for the site of major mega store as well as support staff should be hired. Limits and Exclusions Construction budget for Store C which needs to be relocated is $170,000.Maximum negotiable amount for 5000 sq. feet is $34
per sq. feet Budget for modernization of store A and B is $50000 each. Proper location needs to be found for relocated store so that right number of customer base is touched Hiring of local people with regards to skill set would be done to ensure local involvement and store’s brand building Site work limited to Monday through Friday, 8:00 A.M. to 6:00 P.M. Holidays and leave periods are excluded from the project execution time line.
Bid package 1 – New Store Location Flagstaff, AZ 5000 sq. feet
1. Contractor shall demo all previous light fixtures, ceiling tiles, remove damaged drywall and dispose of properly.
2. Contractor shall repair drywall, install new light fixtures, install ceiling and floor tiles, paint all exterior and interior walls, service
HVAC unit, clean air ducts and windows.
3. Contractor shall chip seal and restripe parking lot.
4. Contractor will install new shelves, counters, checkout stands to include data & power.
5. Contractor will work in conjunction with transition team and meet established schedule.
6. Contractor will supply all materials and labor with the exclusion of shelving, counters and registers to be provided by Retail. Inc.
Color schemes of materials shall meet specifications in addendum A.
7. Project shall not exceed $170,000.00
Bid package 2 Remodel Store #1 Payson, AZ 2500 sq. feet
1. Contractor shall clean all light fixtures and replace covers, install new ceiling tiles, repair damaged drywall and paint all interior
and exterior walls as specified in addendum A.
2. Contractor shall service HVAC unit, clean air ducts and windows.
3. Contractor shall expand parking lot with asphalt 20’ by 60’and paint new parking spaces.
4. Contractor will work in conjunction with store operating hours and not impact more than 300 square ft. of retail space during
operations. 5. Any work that would impact check out registers and restrooms must occur during store closure hour (10:00 pm to 6:00 am).
Contractor will ensure security of building and Retail Inc. property during closure hours.
6. Contractor shall sweep, mop all floors and remove all debris daily.
7. Contractor will supply all materials and labor.
8. Project shall not exceed $50,000.00
Bid Package 3 Remodel Store #2 Prescott, AZ 2500 sq. feet
1. Contractor shall clean all light fixtures and replace covers, install new ceiling tiles, repair damaged drywall and paint all interior
and exterior walls as specified in addendum A.
2. Contractor shall service HVAC unit, clean air ducts and windows.
3. Contractor shall expand parking lot with asphalt 12’ by 40’and paint new parking spaces.
4. Contractor will work in conjunction with store operating hours and not impact more than 300 square ft. of retail space during
operations.
5. Any work that would impact check out registers and restrooms must occur during store closure hour (9:00 pm to 9:00 am).
Contractor will ensure security of building and Retail Inc. property during closure hours.
6. Contractor shall sweep, mop all floors and remove all debris daily.
7. Contractor will supply all materials and labor.
8. Project shall not exceed $42,000.00
Bid package 4 – New Store Transition Askfork, AZ to Flagstaff, AZ
1.
2.
3.
4.
5.
6. Contractor shall box and relocate all retail store stock from old location to new location.
Contractor shall demo all shelving and counters at old location and properly dispose.
Contractor shall crate registers and relocate to new location.
Contractor shall sweep, mop all floors and remove all debris.
Contractor will supply all materials and labor.
Project shall not exceed $12,000.00 Stakeholder Review Stakeholder AAA
Stakeholder BBB IMPROVE FUTURE Find a location of 5000
sq. feet for one of the
stores Ensure new location has
ample amount of space
and customer base Relocate one of the
stores to a new facility
with larger capacity and Further double its size
from 2500 sq. feet to
5000 sq. feet. Local contractors hiring
for relocation of the store Store must meet local
building codes which is in
compliance with Hire skilled personnel for
up gradation MILESTONES Relocation activity activation FEB 14th
Location finalization and foundation MAR 15th
Construction start MAR 16th
Interim inspection of large relocated store and
upgrade initiation of other two stores SEPT 20 th
2015 Modernization of the
other two stores Up gradation process
should take into account
the latest features
available in any retail Hiring flagstaff for the site
of major mega store as
well as support staff
should be hired Limits and Exclusions Construction budget for Store C which needs to be relocated is $170,000.
Maximum negotiable amount for 5000 sq. feet is $34 per sq. feet
Budget for modernization of store A and B is $50000 each.
Proper location needs to be found for relocated store so that right number of customer base is touched
Hiring of local people with regards to skill set would be done to ensure local involvement and store’s brand building
Site work limited to Monday through Friday, 8:00 A.M. to 6:00 P.M.
Holidays and leave periods are excluded from the project execution time line