6
Instructions:Do not discuss the
mid-term with your team members or anyone else. The mid-term is anopen book exam.When quoting a
reference, use proper APA style citations (Author, Year ofpublication,
page#) after any brief quote and then the full reference at the end of the
exam. If you have a question of clarification, post it in the whole class
Session 7 discussion “Mid-Term Exam” area and I will answer for all the class.There is a seven
pagelimitfor this exam. Do not include the questions in
yourresponses. No discussion with your team or class members is
permitted during exam time. Your exam is due in your Assignment Folder Monday
morning 9amEST, Oct.30. Cite only references from our
course readings, sessions 1-6. Don’t forget to put your name on the top
of the exam! No late exams accepted. Use double spacing and only 12
point font.
Question 1:
Reading and Organizing Risk Data(six points/2 points per question):
a)
Each person needs to be able to read
a Probability & Impact scale. Drawing from the worldwide standards PMBOK
Guide scale, Table 11-1 (PMI, 2013, p.318), what “risk rating” by
numerical percentage can be a high risk if a project’s scope is
experiencing many risks of expansion (called “scope creep” due to unauthorized
add-ons) and “unacceptable to sponsor”?
b)
On slide 23 of the PowerPoint
assigned Session 2 there is a list of risk analysis tools and techniques to be
mastered this semester (see http://www.ashraf.co/attachments/article/74/PMP-CH09-Risk-Mgmt.pdf)On p.22 of the PowerPoint presentation and p.25, risk
“prioritization” is defined as part of the overall qualitative risk
analysis process and updating of the Risk ter. How do the authors
Baccarini & Archer (2001) describe this process of “risk ranking” in the
Australian case study they analyze, as they make recommendations for
prioritizing risks? One paragraph limit for your response.
c) Pareto
charts are a useful visual method of plotting data by “frequency” of
occurrence: how often they occur. In your words (the article on PERIL databases
will guide you with examples), why would such a Pareto bar chart be useful for
a PM reporting status of several project risk areas to their internal
stakeholders? See the two articles by Kendrick (2008, 2009) assigned reading in
session 3. One paragraph limit, with correct APA citation format.