Unit VIII ProjectRisk Management Project 2
In this project, you will be given the opportunity to demonstrate your understanding of the risk management conceptscovered in this and previous units in the course.Select a real or imagined workplace setting that involves hazards created by two or more of the hazard sources discussedin Chapters 14-27. Your assignment is to identify and assess the risks in this workplace, propose tactics for reducing therisks, and evaluate the residual risks. Your submission should include the following:
? A brief description of the workplace setting and an explanation of the tasks in this workplace.
? Identification of hazards and risks in the workplace; Job Hazard Analysis (JHA), Failure Modes and EffectsAnalysis (FMEA), or Fault Tree Analysis are to be used, or some combination of these techniques.
? Assessment of the identified risks before risk reduction efforts are applied, using a 5×5 Risk Assessment Matrix.
? Identification of risk reduction tactics to be applied with a brief justification for each tactic selected; multiple tacticscan be applied to each risk if needed.
? Re-assessment of the risks after tactics are applied, using a 5X5 matrix.
? Discussion of the residual risks, and whether you feel they are at a tolerable level.The project must be a minimum of four pages, and a maximum of seven pages in length, not including the title, abstract,
Categories:
