According to the theory of constraints, which of the
following is a financial measurement that can be used to measure the firm’s
ability to make money?

Net profit

Throughput

Inventory

Sales

A material requirements planning system is an example of
which of the following scheduling systems?

Infinite loading, backward scheduling

Finite loading, forward scheduling

Finite loading, backward scheduling

Infinite loading, forward scheduling

A company can produce a small lot of products the first time
at a cost of $2,000. If their 85 percent learning curve allows them to reduce
their costs on each lot, what is the total cost of producing 5 lots?

$10,000.00

$9,376.50

$8,062.00

$4,031.00

In business forecasting, what is usually considered a
medium-term time period?

One to six months

One to five years

Three months to two years

Six weeks to one year

You want to determine the upper control line for a p-chart
for quality control purposes. You take several samples of a size of 100 items
in your production process. From the samples, you determine the fraction
defective is 0.05 and the standard deviation is 0.01. If the desired confidence
level is 99.7 percent, which of the following is the resulting UCL value for
the line?

0.08

0.39

0.05

0.06

6

Which of the following is a multifactor measure of
productivity?

Output/(Labor + Capital + Energy)

Output/Inputs

Output/(Materials)

Output/All resources used

Which of the following is a time-to-market performance
measure used in judging product development performance?

Frequency of new-product introductions

Product reliability

Yield

Customer loyalty

You have just been assigned to oversee a series of projects.
Functional areas will loan you personnel for each project, and separate project
managers will be responsible for separate projects. These project managers will
report to you. Which project management structure is being used?

Functional project

Matrix project

Pure project

Task force

In setting up a kanban control system you need to determine
the number of kanban card sets needed. If the expected demand during lead time
is 25 per hour, the safety stock is 20 percent of the demand during lead time,
the container size is 5, and the lead time to replenish an order is 5 hours,
what the number of kanban card sets is needed?

30

27

20

5

What transportation mode has very high initial investment
costs but gives a very low cost per mile for products that are highly
specialized and require no packaging?

Pipeline

Highway

Water

Rail

11

We would expect to see which of the following in an MRP
system’s inventory status file?

Scrap parts

Labor efficiency

Late/early delivery records

End items produced

12

There are many applications of poka-yokes in service
organizations. Which of the following is one of the three-T’s used to classify
poka-yokes?

Task

Trust

Time

Teamwork

A project starts out as which of the following?

A series of milestones

Critical path method (CPM)

A statement of work

A latest-start-time estimate

Which of the following is a major factor that distinguishes
service design and development from manufacturing design and development?

The service package has the same legal protection available
to manufactured goods.

Manufacturing is far more capital intensive than services.

The service package is the major output of the development
process.

The service process and service product can be developed
independently.

You are a consultant called in to estimate the costs after
the employees learn how to do a job more efficiently by repetition of new
product. You find a company can produce a product the first time at a cost of
$5,000. If their 90 percent learning curve allows them to reduce their costs on
each unit, what is the total cost of producing 100 units of the new product?

$250,687

$290,700

$390,000

$500,000

The ability to rapidly and inexpensively switch production
from one product to another enables what are sometimes referred to as:

Economies of scale

Economies of shape

Economies of scope

Economies of size

17

What is a work breakdown structure?

A definition of the hierarchy of project tasks, subtasks,
and work packages

A depiction of the activities making up a project

A list of the activities making up the higher levels of the
project

A Gantt chart

In development of an operations and supply chain strategy,
which of the following may be an important product-specific criteria to
consider?

Focus

Production lot size

Learning curve

Supplier after-sale support

19

For which of the following should we use an R-chart to
monitor process quality?

Deciding whether an airliner has sufficient fuel for its
trip

Weighing trucks at a highway inspection station to determine
if they are overloaded

Determining whether vehicles from a motor pool will run

Student grades measured from 1 to 100

If a firm produced a standard item with relatively stable
demand, the smoothing constant alpha (reaction rate to differences) used in an
exponential smoothing forecasting model would tend to be in which of the
following ranges?

20 to 80 percent

20 to 50 percent

60 to 120 percent

5 to 10 percent

Which of the following is one of Dr. Eli Goldratt’s rules of
production scheduling for optimized production technology?

Utilization and activation of a resource are not the same

Balance the capacities, not the flows

Do not allow bottlenecks to govern the flow of the line

An hour lost at a bottleneck saves an hour for the entire
system

Which of the following is a reason that firms must develop
more new products than ever?

They are replacing old customers with new ones

Commitments to joint venture partners

Product life cycles are shorter

To amortize heavy investments in development labs

Assuming no safety stock, what is the reorder point (R)
given an average daily demand of 78 units and a lead time of 3 days?

234

26

78

421

Capacity planning that involves hiring, layoffs, some new
tooling, minor equipment purchases, and subcontracting is considered as which
one of the following planning horizons?

Intermediate range

Short range

Long range

Current

25

Which of the following is an alternative possible service
encounter included in the service-system design matrix?

Internet

Face-to-face distance

Questionnaire response

Automated teller (ATM)

A major competitive dimension that forms a company’s
strategic operational competitive position in their strategic planning is which
of the following?

Focus

Automation

Cost or price

Straddling

Which of the following is a measure of operations and supply
management efficiency used by Wall Street?

Receivable turnover

Earnings per share growth

Dividend payout ratio

Current ratio

The objectives of work center scheduling include which of
the following?

Minimizing setup costs

Following all the priority rules

Avoiding tradeoffs

Providing variety to workforce

29

The Pareto principle is best applied to which of the following
inventory systems?

Fixed-order quantity

EOQ

ABC classification

Fixed-time-period

The centroid method for plant location uses which of the
following data?

Correlation matrix of existing facilities

Transport times between facilities

Volume of goods to be shipped between existing points

Inbound transportation costs